Selfsame Labs

Products

Each product page lists what the tool does, which versions it supports, what it needs to run, and what it costs.

Excel and Word to Revit and AutoCAD

Places equipment schedules from Excel and general notes from Word on Revit sheets and AutoCAD layouts as native tables and text, and reloads them when the files change.

Includes write-back: edit a cell, renumber notes or drag a column width inside Revit or AutoCAD, and the change is written to the source file.

A workflow tool. It performs no engineering calculations.

Read the product page

Drawing of a schedule before and after Reload: the CFM of EF-3 changes from 1,000 to 1,200 and is outlined. A revision triangle added by hand beside the table is still there after Reload. Before EXHAUST FAN SCHEDULE TAG SERVICE CFM HP EF-1 TOILET ROOMS 150 1/10 EF-2 JANITOR CLOSET 75 1/20 EF-3 ELECTRICAL RM 1,000 1/2 EF-4 GENERAL EXH. 2,400 1 1 After Reload EXHAUST FAN SCHEDULE TAG SERVICE CFM HP EF-1 TOILET ROOMS 150 1/10 EF-2 JANITOR CLOSET 75 1/20 EF-3 ELECTRICAL RM 1,200 1/2 EF-4 GENERAL EXH. 2,400 1 1 Added by hand: stays
Reload redraws the table from the changed file and keeps what you added by hand. Drawing, not a screenshot; synthetic data.
Status
Coming soon
Revit
2023 to 2027
AutoCAD
2023 to 2027, including AutoCAD MEP. Not LT.
Trial
14 days, all features, from launch
Price
$139 one-time, per user, from launch

Drawing production and model QC

Revit Tools for Autodesk® Revit®

Nine tools that check tags against schedules, count devices by sheet, find open duct and pipe ends, set up sheets, align viewports and fill title block fields.

Every edit is previewed first and runs as one undo step. Elements owned by other users are skipped, and nothing is deleted.

A workflow tool. It performs no engineering calculations.

Read the product page

Status
Coming soon
Revit
2023 to 2027. Not LT.
Trial
14 days, all features, from launch
Price
$49 one-time, per user, from launch

Further tools are planned. Each will be listed here when it ships, with the same documentation. Development notes.